Importantly the DCLG description includes the words 'Full Description'
and makes reference to the type of building, its construction and the
occupancy profile. This part of the executive summary needs to be
specific to the building being inspected.
What...
In December 2012, the Government publication: A guide to air
conditioning inspections for buildings was updated.
THE ORIGINAL PUBLICATION STATED:
An air-conditioning system refers to any system where refrigeration is
used to provide cooling for the co...
http://www.sterlingaccreditation.com/members/guidance/tips/Common%20Errors%20that%20trigger%20Air%20Conditioning%20Audit%20Failures.pdf
[http://www.sterlingaccreditation.com/members/guidance/tips/Common%20Errors%20that%20trigger%20Air%20Conditioning%20Aud...
Mechanical ventilation systems that provide no mechanical cooling
themselves, but serve spaces that are cooled by other means are
included. Any components contained in air conditioning systems that
are only intended to provide heating are excluded.
TM44...
The following table has been extracted from the Air Conditioning
Scheme Operating requirements for auditing.
DCLG requires the following as ‘MINIMUM EVIDENCE’
MINIMUM EVIDENCE REQUIREMENTS
Dates and times of Air Conditioning Inspection.
Site N...
This can be a short sentence or paragraph that includes the days and
hours of operation with a brief description of the type of work
carried out on site.
EXAMPLE:
The core activities within the building relate to Call Centre and
warehouse
work. The ...
Regardless of whether sampling has been used or not. It is a mandatory
requirement for an Executive Summary to include a Sampling Statement.
A sampling statement is not a generic statement, it is a specific
statement relating to the equipment on site. I...
The following basic calculation should be supplied as part of your
audit pack
Example
Supply volume: 5 m3·s-1 (5000 litre/s)
Extract volume: 4 m3·s-1 (4000 litre·s-1)
Supply motor capacity: 7.5 kW
Extract motor capacity: 4 kW
STEP 1
Calculat...
DCLG and the auditing process, requires the following 6 points of
reference to be included in every executive summary.
1.Full description of the building type/construction details (building
benchmark and occupancy profile)
2.System type/detail detaili...