From 9 January 2013, if you are an occupier of a building requiring a DEC, you will need to display a DEC showing an operational rating in a prominent place clearly visible to the public. You will also need to have in your possession or control a valid advisory report.

If you are a new occupier, or have been in occupation for less than 15 months by 9 January 2013, you may not have the previous 12 months of meter readings available that are required for an operational rating. The legislation makes provisions for calculation over the period of occupation in these cases.