Knowledgebase: DCLG Guide to Air Conditioning
When air conditioning inspections are required
Posted by Mike Gordon on 22 July 2015 12:15 PM
|
|
All air conditioning systems with an effective rated output of more than 12kw must be regularly inspected by an energy assessor. The inspections must be no more than five years apart. The regulations require the first inspection of the affected air conditioning systems to be carried out as follows:
| |
|