The following table has been extracted from the Display Energy Certificate Scheme Operating requirements for auditing.
DCLG requires the following as ‘minimum evidence’
Minimum Evidence Requirements
(Site Visited)
|
Data file, and / or software data collection forms, relating to information used by an EA to calculate the DEC.
|
The EA shall provide within the site notes anything used in support of creating the DEC. Site notes shall be dated and signed.
|
Design Floor Plan, elevations, Sections, hand drawn schematics which allow the floor area to be calculated.
|
Arial view of building from Google maps (or link to this) or similar that clearly identifies the building and allows a sense of site dimensions.
|
Photographs of all elevations: front, rear and side (s)
|
Supplementary calculations undertaken by the assessor outside of the DEC software
|
Energy information from client
|
Evidence which can demonstrate extended occupancy hours. This needs to be evidenced in a manner which is additional to site notes
|
Evidence which can demonstrate separable energy use. This needs to be evidenced in a manner which is additional to site notes
|
Benchmarking evidence
Can be provided through the combination of photographs and site notes
|
|
- Remember to sign and date your site notes; this needs to be reflective of the actual inspection date.
- Photos need to be provided individually in their original jpeg format (not embedded into a pdf or word document). This allows the date taken to be checked against the nominated inspection date.
- Site notes need to be scanned and not photographed.
Minimum Evidence Requirements
(Site not Visited)
|
Data file, and / or software data collection forms
|
No change in use, occupancy hours, separable energy use, building dimensions.
|
Energy information, site information; Checks as per the case with “site visit”
|
Minimum Evidence Requirements
(Advisory Report)
|
Site schematic, site notes detailing key systems. Photographs as necessary.
|
Evidence required to justify the suppression or inclusion of additional recommendations
|
Signed and dated site notes. Photographs of building and services.
|
The above table will be used as part of our auditing process; missing evidence will be clearly marked and could have an impact on the auditors ability to complete a satisfactory audit.
Please review your Inspection and evidence submission processes to ensure that you are able to comply with the Government Requirements.
|