DCLG and the auditing process, requires the following 6 points of reference to be included in every executive summary.

1.Full description of the building type/construction details (building benchmark and occupancy profile)

2.System type/detail detailing the amount and types of HVAC plant on site

3.Sampling statement in accordance with DCLG guidance, stating the units sampled and the reasoning behind the sampling strategy

4.Comments on the controls/maintenance/operation

5.Comments on the availability of system documentation (or whether it had to be prepared)

6.Additional information of relevance to the building/system/inspection/report